Climate Action and Energy Plan
Engineering Standards "Schedule B" 1993
Highway Access Permit - Single Family Dwelling and Duplex
Traffic control personnel and signage will be in place during construction. Traffic will be limited to single-lane alternating through the work zone and may cause minor delays. Impacted residents and businesses will be advised of planned water outages. Construction may limit on-street parking and cause periodic driveway closures throughout the project area.
The project consists of the replacement of approximately 400m of pipe, which is beyond its useful lifespan.